Industrial Plant
Danfoss Haiyan Campus Phase II
Key Product: FM Certified Seismic Bracing Systems
Quantity: 2,000 lateral seismic braces
Challenge Solved: The Haiyan Campus Phase II, Danfoss’ largest manufacturing site in China, required a fully compliant and ultra-reliable seismic bracing system for its extensive fire pipeline network.
Year: 2025
Quantity: 2,000 lateral seismic braces
Challenge Solved: The Haiyan Campus Phase II, Danfoss’ largest manufacturing site in China, required a fully compliant and ultra-reliable seismic bracing system for its extensive fire pipeline network.
Year: 2025
Industrial Plant
Schneider Electric Wuxi Smart Manufacturing Park
Key Product: FM Certified Seismic Bracing Systems
Quantity: 4,000
Challenge Solved: Required a fully compliant, high-reliability seismic bracing solution for its 36 km fire protection system—meeting both GB50981-2014 and FM Global DS 2-8 standards.
Year: 2025
Quantity: 4,000
Challenge Solved: Required a fully compliant, high-reliability seismic bracing solution for its 36 km fire protection system—meeting both GB50981-2014 and FM Global DS 2-8 standards.
Year: 2025
Industrial Plant
SLB Shanghai Manufacturing Center
Key Product: FM Certified Seismic Bracing Systems
Quantity: 2,500
Challenge Solved: Required a complete FM-compliant upgrade of its fire protection seismic bracing system—without disrupting ongoing manufacturing operations.
Year: 2023
Quantity: 2,500
Challenge Solved: Required a complete FM-compliant upgrade of its fire protection seismic bracing system—without disrupting ongoing manufacturing operations.
Year: 2023
New Energy Vehicle Industry
NIO Chuzhou F4 Factory – Anti-Drop Bracing System Case Study
Key Product: Anti-Drop Bracing Systems
Quantity: 13,000+
Challenge Solved: Requiring reliable overhead safety solutions with high load capacity, corrosion resistance, and fast installation under tight deadlines.
Year: 2024
Quantity: 13,000+
Challenge Solved: Requiring reliable overhead safety solutions with high load capacity, corrosion resistance, and fast installation under tight deadlines.
Year: 2024