SLB Shanghai Manufacturing Center
SLB Shanghai Manufacturing Center – FM Certified Seismic Bracing Case Study
HOOGO Eliminates Seismic Compliance Risks and Secures Critical Fire Protection Systems for the World’s Leading Oilfield Technology Provider
Project Overview (30-Second Summary)

Client: SLB (Schlumberger) – the world's largest oilfield technology and services company.
Challenge: SLB’s Shanghai facility, operating at full production capacity, required a complete FM-compliant upgrade of its fire protection seismic bracing system—without disrupting ongoing manufacturing operations.
Solution: HOOGO provided over 2,500 FM Certified Seismic Bracing Systems, including rigid braces, end restraints, and flexible couplings, along with a fully engineered FM seismic solution approved by FM Global.
Value: Achieved 100% seismic coverage across Phase I and Phase II production areas, removed all non-compliance risks, and ensured uninterrupted operations during the upgrade.
Client Background & Project Challenges
A Critical Manufacturing Hub for Global Oilfield Operations
SLB Oilfield Equipment (Shanghai) Co., Ltd. serves as a core manufacturing center for the company's global product supply chain:
Supplies equipment to CNPC, Sinopec, and global operators
Products shipped to 45+ countries and regions
Annual industrial output in 2024 exceeded 2.698 billion RMB
Production lines run continuously at maximum capacity
As a high-risk industrial site producing lithium batteries, measurement-while-drilling tools, and logging equipment, the facility requires absolute reliability of its fire protection system.
Project Scale & Operational Constraints
Total site area: 240,000 m²
Phase I & II include 7 independent factory buildings
Fire protection network spans across complex workshop environments
Installation had to be completed without interrupting live production
FM Global required full correction of seismic bracing deficiencies to maintain insurance coverage
The combination of strict FM standards and limited installation windows represented the core challenge of the project.

Dual Compliance Requirements
All seismic bracing upgrades had to meet:
GB50981-2014 Seismic Design Code for MEP Installations
FM Global DS 2-8 Earthquake Protection Standard
Both standards require fire protection systems to remain fully functional during an intensity 8 seismic event.
HOOGO's Seismic Bracing Solution
Product Scope & Deployment
HOOGO supplied and installed:
1,250 FM Certified Seismic Braces
750 End Restraint Assemblies
500 Flexible Couplings
These components ensured full seismic reinforcement of the fire protection system across pump rooms, production areas, and multi-story workshops.
Engineering Highlights & Technical Advantages
1. Full Pipe Diameter Coverage for Complex Factory Layouts
HOOGO's FM system is certified for:
DN25–DN300 pipe diameters
30°–90°installation angles
This flexibility is essential for retrofit projects with structural obstructions, tight clearances, and irregular pipe routing.
2. BIM-Driven Design Coordination
HOOGO developed a complete BIM model of the seismic bracing system:
Verified all load paths and brace locations
Eliminated installation conflicts with production equipment
Sequenced construction areas to match SLB's production schedule
Ensured full compliance with FM Global's audit requirements
3. High-Durability Corrosion Protection
All components adopt HOOGO's patented anti-corrosion coating:
3,000+ hours of salt-spray resistance
Ideal for workshops with humidity, dust, and temperature variation
This ensures long-term reliability of critical life-safety systems.
Project Results & Delivered Value
1. 50% Faster Installation – Completed in Only 6 Weeks
Thanks to HOOGO's modular components and BIM-based planning:
No on-site welding required
Minimal disruption to production activities
Entire seismic retrofit completed within 6 weeks, compared to the typical 10–12 weeks for traditional methods
2. 30% Lower Total Lifecycle Cost
Savings were achieved through:
Reduced labor and installation time
Lower rework rate due to BIM design accuracy
Long-term corrosion resistance minimizes maintenance
3. 80% Reduction in Seismic System Failure Risk
After the upgrade:
All fire pipelines now meet FM DS 2-8 and GB50981 requirements
System reliability under seismic loading significantly increased
FM Global accepted the upgraded system without additional corrective actions
This ensures uninterrupted protection for both personnel and high-value production assets.
4. A New Compliance Benchmark for SLB China
SLB Shanghai, approved as a multinational company headquarters in 2023, has become a regional benchmark for seismic compliance.
Following this project:
HOOGO's FM Certified Seismic System has been successfully implemented in both SLB Shanghai and SLB Chengdu facilities
HOOGO continues to support SLB's future safety and compliance initiatives across China
Why SLB Selected HOOGO
Full suite of FM/UL/ETA/CE certified seismic solutions
Strong engineering expertise and professional BIM support
Proven performance in complex retrofit environments
High-efficiency modular systems reduce installation time
Trusted by leading global industrial and energy companies
HOOGO delivers reliable, compliant, and scalable seismic protection solutions for mission-critical industrial facilities.
Contact HOOGO for FM Seismic Engineering Support
For FM Global compliance, seismic retrofit engineering, or new-build design support, HOOGO provides full technical assistance and solution development.
? WhatsApp: +86 184 5226 4005
? Email: info@szhoogo.com
Get a free preliminary BIM layout and FM seismic compliance consultation.