Project Overview (30-second Summary)

Client: Schneider Electric – A Fortune Global 500 leader in energy management and industrial automation.
Challenge: The company's new 67,000 m
² Wuxi Smart Manufacturing Park required a fully compliant, high-reliability seismic bracing solution for its 36 km fire protection systemmeeting both GB50981-2014 and FM Global DS 2-8 standards.
Solution: HOOGO delivered over 4,000 FM Certified Seismic Bracing Systems, covering the entire fire pipe network, HVAC ducts, and electrical cable trays.
Result: Achieved 100% seismic compliance, strengthened system resilience to withstand magnitude 8 earthquakes, significantly reduced installation time, and safeguarded over 1.2 billion RMB worth of production assets.


Client Background & Project Challenges

As Schneider Electric's flagship smart factory in China, the Wuxi Industrial Park plays a strategic role in global production and supply for critical low-voltage electrical components. The facility includes:

  • 67,000 m² total construction area

  • 58,000 m² high-precision manufacturing zone

  • Over 36 km of fire protection pipeline

  • Extensive HVAC and cable tray systems supporting mission-critical operations

Key Challenges

1. Extremely High Seismic Safety Requirements

To ensure uninterrupted operation during seismic events, Schneider required that all MEP systems comply with:

  • GB50981-2014 Seismic Design Code for Mechanical and Electrical Installations

  • FM Global DS 2-8 Earthquake Protection Standard

These standards mandate that life-safety systems, especially fire protection, remain fully functional after an earthquake.

2. Large-Scale MEP System Integration

The fire, HVAC, and electrical systems span multiple production workshops, clean areas, and precision assembly zones. Any installation error could lead to system failure or future maintenance issues.

3. Strict Project Timeline

As a core manufacturing hub, timely commissioning was essential. Schneider needed a partner capable of fast design, fast delivery, and efficient installation without compromising safety.


HOOGO's Comprehensive Solution

FM Certified Seismic Bracing System Deployment

HOOGO provided a complete suite of FM-approved seismic bracing products, including:

  • 2,600+ lateral seismic braces

  • 1,400+ longitudinal braces

  • Full coverage of:

    • 36 km fire pipelines

    • 30,000 m² HVAC duct systems

    • Key electrical cable tray corridors

Technical Strength & System Advantages

1. Precision Engineering Backed by BIM

All bracing points were modeled and calculated using HOOGO's proprietary BIM engineering tools to ensure:

  • Each node withstands≥ 8.5 kN longitudinal load

  • Each lateral brace withstands ≥ 13.2 kN lateral load

  • Performance exceeding both Chinese code & FM Global requirements

This minimized design conflicts and reduced on-site rework.

2. Superior Durability with HOOGO Patented Anti-Corrosion Coating

Through 3,000+ hours of salt-spray testing verified by HOOGO's laboratory, the coating ensures exceptional corrosion resistance—critical in industrial environments with fluctuating temperature and humidity.

3. Fully Modular System for High Installation Efficiency

HOOGO's pre-engineered components:

  • Required no on-site welding

  • Reduced installation complexity

  • Ensured consistent quality across all workshops

施耐德 (1)


Project Results & Delivered Value

1. 50% Faster Installation Efficiency

Thanks to HOOGO's modular design, installation speed improved dramatically, saving:

  • 14 weeks of project schedule

  • Significant labor and management costs

2. 30% Cost Reduction (Total Lifecycle)

HOOGO's integrated engineering service + FM certified products minimized:

  • Design coordination costs

  • Procurement workload

  • Future maintenance complexity

3. 80% Reduction in Earthquake-Related System Failure Risk

The seismic bracing system ensures the fire protection network remains operational during major seismic events—protecting:

  • Over 1.2 billion RMB in production equipment

  • Cleanroom processes

  • High-precision manufacturing lines

4. A Global Benchmark for Schneider Electric

This is Schneider Electric's first factory worldwide to adopt a fully FM certified seismic protection system.
The success of this project led to the standard being recommended for other Schneider facilities in Asia and Europe.


Why Schneider Chose HOOGO

Global product certifications: FM, UL, ETA, TÜV, CE
Proven experience with top global enterprises
Strong R&D capabilities with 60+ patents
Integrated BIM design + engineering consulting
Reliable delivery capacity for large-scale projects


HOOGO continues to support Schneider Electric globally in building safer, smarter, and more reliable industrial environments.




Recommended Products

FM Approved Roof-Mounting PV Module Systems

Continue Reading

FM Approved Seismic Bracing Systems

Continue Reading

ETA Certified Anchor Fixing System

Continue Reading

Flood Barrier System

Continue Reading

MEP Support Systems

Continue Reading